|
Who's Online
There currently are 6043 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Alte gescannte Servicepläne sind oft doch etwas undeutlich . Stromlaufpläne werden auf mehrere DIN A4 Seiten aufgeteilt. Alles ziemlich umständlich und zeitaufwendig. Aber mit etwas Mühe geht alles.
;
Great item, high resolution, detailed, very easy to work with.
;
fast delevery of the manual and very complete manual, now my Akai works again, will buy again, thanks.
;
Tartalma megfelelő. Szebb kivitelű is lehetne a scannelés.
;
I never been disappointed in my dealings with owners-manuals.com
DMC-L10KPP / DMC-L10KE / DMC-L10KEB / DMC-L10KEG / DMC-L10KGC / DMC-L10KGD / DMC-L10KGK / DMC-L10KGN / DMC-L10KGT
8 HOW TO REPLACE THE LITHIUM BATTERY
8.1. REPLACEMENT PROCEDURE
1. Remove the MAIN PCB. (Refer to Disassembly Procedures.) 2. Remove the Lithium battery (Ref. No. �ZB9101� at component side of MAIN PCB) and then replace it into new one.
NOTE: This Lithium battery is a critical component. (Type No.: ML421S/ZT Manufactured by Matsushita Battery Industrial Co.,Ltd.)It must never be subjected to excessive heat or discharge. It must therefore only be fitted in requirement designed specifically for its use. Replacement batteries must be of same type and manufacture. They must be fitted in the same manner and location as the original battery, with the correct polarity contacts observed. Do not attempt to re-charge the old battery or re-use it for any other purpose. It should be disposed of in waste products destined for burial rather than incineration.
NOTE Above caution is applicable for a battery pack which is for DMC-L10K series, as well.
11
|
|
|
> |
|