Who's Online
There currently are 5857 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Manual-link came 30 minutes after having paid for an extremely rare (40 years old) item (sony icr-120) and helped me to get the radio rework again. So really good help for me, fast and reliable delivery and -taken that into consideration- a very reasonable price for that service. So thanks again! Mike, Germany
;
Some of the pictures in this manual are a bit irritating. I had to dissassemble the unit and some of the screws have different threads, which is not mentioned in this manual. Also some of the drawings of the boards look different than the actual boards.
After all, the manual was very useful. I was able to recalibrate the capstan drive and it is working fine again.
;
This manual is very good. 303 pages scanned in a very high resolution. My camera has bad, leaking capacitors which all of the V5000 models are suffering from these days.
There is a huge part list with all capacitors, transistors etc. in this manual which helped me a lot. Otherwise I would not have been able to buy replacement parts.
The dissassembly guide is very enormous and detailed. Unlike on the Panasonic MS1 manual I downloaded here it actually looks like the real parts look. And the screws are labeled correctly, so you shouldn't have any left after the repair. ;)
;
has all the schematics you could need,and very well laid out format also has all part numbers along with an exploded view which is helpful
;
Very nice to have! Now it is no problem to understand how it is put together.
Helps me a lot.
NN-T793SF / NN-T783SF / NN-T763SF / NN-S763BF / NN-S763WF / NN-S753BF / NN-S753WF / NN-S743BF / NN-S743WF
4 PROCEDURE FOR MEASURING MICROWAVE ENERGY LEAKAGE
4.2.1. Measurement with the outer panel removed.
Whenever you replace the magnetron, measure for radiation leakage before the outer panel is installed and after all necessary components are replaced or adjusted. Special care should be taken in measuring around the magnetron.
NOTE: The U.S. Government standard is 5 mW/cm 2 while in the customer�s home. 2mW/cm 2 stated here is our own voluntary standard. (1mW/cm2 for Canada)
4.2.2.
Measurements with a fully assembled oven.
4.1.
Equipment
After all components, including outer panel are fully assembled, measure for radiation leakage around the door periphery, the door viewing window, the exhaust opening and air inlet openings.
� Electromagnatic radiation monitor � 600cc glass beaker
� Glass thermometer 212°F or 100°C
4.3.
Record keeping and notification after measurement
4.2.
Procedure for measuring radiation leakage
� After any adjustment or repair to a microwave oven, a leakage reading must be taken. Record this leakage reading on the repair ticket even if it is zero. A copy of this repair ticket and the microwave leakage reading should be kept by repair facility. � Should the radiation leakage be more than 2 mW/cm2 (1mW/cm for Canada) after determining that all parts are in good condition, functioning properly, and genuine replacement parts as listed in this manual have been used, immediately notify PASC, PSC or PCI.
Note before measuring. � Do not exceed meter full scale deflection. Leakage monitor � should initially be set to the highest scale. � To prevent false readings the test probe should be held by the grip portion of the handle only and moved along the shaded area in Figure no faster than 1 inch/sec (2.5cm/sec). � Leakage with the outer panel removed ...... less than 5mW/cm2. � Leakage for a fully assembled oven with door normally closed ...... less than 2mW/cm 2 (1mW/cm 2 for Canada). � Leakage for a fully assembled oven [Before the latch switch (primary) is interrupted] while pulling the door ...... less than 2mW/cm 2. 1. Pour 275 ± 15cc (9ozss± 1/2oz) of 20°C ± 5°C (68° ± 9°F) water in a beaker which is graduated to 600cc, and place in the center of the oven. 2. Set the radiation monitor to 2450MHz and use it following the manufacturer´s recommended test procedure to assure correct results. 3. When measuring the leakage, always use the 2 inch (5cm) spacer supplied with the probe. 4. Tap the start pad or set the timer and with the magnetron oscillating, measure the leakage by holding the probe perpendicular to the surface being measured.
4.4.
At least once a year, have the radiation monitor checked for calibration by its manufacturer.
8
|
|
|
> |
|